• Forum
  • Blog
  • Chat
  • Store
This site is adsfree for members.
  • Board index ‹ Blogs ‹ LaurentH's Blog ‹ A400M Problems Range Far Beyond Engines
  • Change font size
  • Print view
  • Blogs
  • FAQ
  • Calendar
  • Register
  • Login

USER_AVATAR
LaurentH
Moderator
Moderator
 
Posts: 1619
Joined: Sun Nov 30, 2008 8:34 pm
Location: Beringen (Belgium)
Blog: View Blog (18)
  • E-mail
  • Website
Archives
- September 2009
Belgium to join Sheppard AFB program
   Sun Sep 27, 2009 12:16 pm

+ March 2009
Voorzitter Airbus sluit crash A400M niet uit
   Sun Mar 29, 2009 4:12 pm

+ February 2009
Airbus’s A400M Plane Should Be Canceled in U.K., Lawmakers Say
   Thu Feb 26, 2009 8:35 pm
F-22 Raptor To Make Paris Air Show Debut
   Thu Feb 05, 2009 10:34 pm
Can the Airbus A400M Be Saved?
   Thu Feb 05, 2009 10:33 pm

+ January 2009
EADS denies mulling collapse of A400M project
   Wed Jan 28, 2009 9:56 pm
A400M Problems Range Far Beyond Engines
   Wed Jan 28, 2009 9:55 pm
A400M May Face Design Overhaul To Meet Performance Targets
   Mon Jan 26, 2009 4:15 pm
France sees A400M response by June
   Fri Jan 23, 2009 3:13 pm
EADS wants A400M contract change, adds delay
   Mon Jan 12, 2009 10:06 pm

+ December 2008
C130H CH14 makes first flight
   Sat Dec 20, 2008 2:40 pm
A400M EPI TP400 engine takes off.
   Fri Dec 19, 2008 9:42 pm
Airbus A400M engine test key for project credebility
   Sat Dec 13, 2008 2:25 pm
Vervanging Airbus A310s
   Thu Dec 11, 2008 4:38 pm
Fighter Weapons Instructor Training (FWIT) 2008 Leeuwarden
   Wed Dec 10, 2008 9:24 pm
Minister bezoekt A400M
   Wed Dec 10, 2008 9:20 pm
Sea King RS01 krijgt plaatsje in het museum !
   Sat Dec 06, 2008 6:27 pm
Germany told of 18-month A400M delay
   Tue Dec 02, 2008 8:08 pm

Search Blogs

Advanced search

A400M Problems Range Far Beyond Engines

Permanent Linkby LaurentH on Wed Jan 28, 2009 9:55 pm

PARIS Jan23rd, 2009 – Airbus is facing much more than just contractual and schedule challenges in its A400M military airlifter program, as the aircraft may need massive re-engineering work to achieve its performance targets.
In turn, numerous issues threaten to make the A400M a less attractive and capable aircraft for its customers, industry sources tell Aviation Week. They come in addition to the well-publicized delays in the flight-test program that are linked to the lagging engine full authority digital engine control (FADEC) development (Aerospace DAILY, Nov. 25, 2008).
One key area of concern appears to be the A400M being overweight, which would negatively affect the aircraft’s payload and range capabilities. Sources close to the program say the aircraft is significantly heavy in its current development status. The first six units to be used in the flight-test program are 12 tons heavier than planned, those sources say. A weight savings campaign has identified a reduction potential of 7 tons. Early production aircraft will only incorporate reductions of 5 tons at the most, leaving payload below the 30-ton mark.
Airbus officials suggest the main performance criteria aren’t at any particular risk. Executive Vice President for Programs Tom Williams says the more he has reviewed the program, the more certain he has become “this is still going to be a bloody good airplane.” The aircraft is beating its short field performance and load targets, he says.
Yet, industry sources say the weight problem could well turn out to be the primary issue with the aircraft, rather than engine software. One observer believes the A400M payload will end up 3-4 tons below the original target even after all possible design changes, which could include the introduction of carbon fiber in noncritical areas. The three-year time frame proposed by EADS between the first flight and first delivery at the end of 2012 at the earliest would suggest that modifications to some parts of the aircraft structure also are possible.
Sources close to the Europrop International engine consortium say that FADEC issues with the TP400 are expected to be resolved by June. The EADS chief executive said earlier this month that once an acceptable standard FADEC was provided, the A400M could fly around one month later. But in addition to software, there are also hardware issues surrounding the engines. Because of unexpectedly high loads, cracks were found in some of the original design engine gearbox casings. Those needed to be partially strengthened. The sources say that upgraded casings already have been delivered to the Sevilla, Spain, final-assembly line and will be installed to replace the original parts.
Some special operational performance goals also are in doubt, according to people familiar with the details. The A400M may not be able to fly “Sarajevo profile” steep approaches because of possible flutter issues with the propellers.
Finally, some systems may be rejected by the European Aviation Safety Agency (EASA), people familiar with the program say. The agency appears not to agree with how oxygen bottles and fire protection systems are installed in the fuselage and main gear bay. If no agreement is reached, the A400M will not be given EASA approval needed for the planned civil certification.
An EASA official says the agency does not comment on ongoing certification processes.
Last edited by LaurentH on Wed Jan 28, 2009 9:56 pm, edited 1 time in total.

http://www.flickr.com/photos/62068515@N05/
0 Comments Viewed 6606 times

Who is online

Registered users: Bing [Bot], Google [Bot]

  • Board index
  • The team • Delete all board cookies • All times are UTC [ DST ]
© 2008, 2009 KBSPOTTING.BE
Powered by phpBB © 2000, 2002, 2005, 2007 phpBB Group
Blogs powered by User Blog Mod © EXreaction